ITS News

Information Technology Services

Update (Resolved): 7/31/2019, 2:00 p.m. A partial network outage in multiple campus buildings occurred between approximately 7/30/2019, 5:20 p.m. and 7/31/2019, 2:00 p.m. ITS confirms that network connectivity is restored in all buildings. The outage was caused by a utility power interruption. We apologize for any inconvenience caused by this issue. For technical assistance, please [Read More]

Who: Students, faculty, and staff What: Planned network downtime for multiple buildings (see list of affected buildings) When: Friday, July 26, 5:00 a.m. – 7:30 a.m. Why: ITS will perform network maintenance in multiple buildings. Wired, wireless, and VoIP connectivity will be down or intermittent during the maintenance window. Affected buildings: Walker Parking Deck Campus [Read More]

Who: Students, faculty, and staff What: Planned network downtime for multiple buildings (see list of affected buildings) When: Friday, July 19, 5:00 a.m. – 7:30 a.m. Why: ITS will perform network maintenance in multiple buildings. Wired, wireless, and VoIP connectivity will be down or intermittent during the maintenance window. Affected Services: Virtual Desktops Apps Hosted [Read More]

Who: Students, faculty, and staff What:  Planned network downtime for multiple buildings (see list of affected buildings) When: Saturday, February 9, 2019, 5:30 a.m. to 7:30 a.m. Why: ITS will perform network maintenance in multiple buildings.  Wired, wireless, and VoIP connectivity will be down or intermittent during the maintenance window. List of affected buildings: Moore-Strong Hall [Read More]

Who: Faculty, staff, and students What: Planned network downtime for Brown and Eberhart When: Saturday, February 9, 2019, 5:30 a.m. – 7:30 a.m. Why: ITS will perform network maintenance in Brown and Eberhart. During the maintenance window, there will be intermittent loss of network services including wired, wireless, and VoIP services in the building. If you [Read More]